Skip to content

August 2019 Morning Status Meetings

sblondel edited this page Aug 30, 2019 · 16 revisions

This page contains a brief summary of the status of the Xolotl development team each morning during the month of August 2019.

20190801

Sophie - Analyzing the PISCES He data to check Xolotl is behaving correctly. Updating the MOOSE coupling branch with the latest improvements of the NE network.

20190806

Sophie - Updating the MOOSE coupling branch with the latest improvements of the NE network. Continuing to work on PISCES and ITER data.

20190807

Sophie - Starting to test C++14. Continuing to work on PISCES and ITER data.

20190809

Sophie - Continuing to work on ITER data and heat equation. Checking the refinement of the grid script for the PISCES data.

20190812

Sophie - Continuing to work on ITER data and heat equation. Testing Cori KNL.

20190813

Sophie - Building MOOSE and Xolotl on Falcon. Testing the scaling of Xolotl PSI 1D.

20190814

Sophie - Testing MOOSE and Xolotl on Falcon. Continuing the scaling of Xolotl PSI 2D.

20190816

Sophie - Profiling Xolotl PSI in 2D. Working on improving the Wiki.

20190819

Sophie - Testing a bi-modal distribution with re-solution in NE. Working on ITER stuck simulations.

20190820

Sophie - Testing Shashi's solution on grouping with moments. Working on ITER stuck simulations.

20190821

Sophie - Working on ITER stuck simulations. Testing Cori KNL.

20190823

Sophie - Analyzing PISCES simulations, comparing regridded results to standard ones. Continuing boost program options implementation.

20190826

Sophie - Improving the regridding script to start at the same depth as the original one. Continuing boost program options implementation.

20190827

Sophie - Analyzing the data from PSI 2D scaling. Working on D trapping model.

20190828

Sophie - Starting to think about implementation of a dynamic grid.

20190830

Sophie - Continuing the implementation of a dynamic grid (for surface growth first), and working on the heat equation cases.

Clone this wiki locally