-
Notifications
You must be signed in to change notification settings - Fork 21
August 2019 Morning Status Meetings
This page contains a brief summary of the status of the Xolotl development team each morning during the month of August 2019.
Sophie - Analyzing the PISCES He data to check Xolotl is behaving correctly. Updating the MOOSE coupling branch with the latest improvements of the NE network.
Sophie - Updating the MOOSE coupling branch with the latest improvements of the NE network. Continuing to work on PISCES and ITER data.
Sophie - Starting to test C++14. Continuing to work on PISCES and ITER data.
Sophie - Continuing to work on ITER data and heat equation. Checking the refinement of the grid script for the PISCES data.
Sophie - Continuing to work on ITER data and heat equation. Testing Cori KNL.
Sophie - Building MOOSE and Xolotl on Falcon. Testing the scaling of Xolotl PSI 1D.
Sophie - Testing MOOSE and Xolotl on Falcon. Continuing the scaling of Xolotl PSI 2D.
Sophie - Profiling Xolotl PSI in 2D. Working on improving the Wiki.
Sophie - Testing a bi-modal distribution with re-solution in NE. Working on ITER stuck simulations.
Sophie - Testing Shashi's solution on grouping with moments. Working on ITER stuck simulations.
Sophie - Working on ITER stuck simulations. Testing Cori KNL.
Sophie - Analyzing PISCES simulations, comparing regridded results to standard ones. Continuing boost program options implementation.
Sophie - Improving the regridding script to start at the same depth as the original one. Continuing boost program options implementation.
Sophie - Analyzing the data from PSI 2D scaling. Working on D trapping model.
Sophie - Starting to think about implementation of a dynamic grid.
Sophie - Continuing the implementation of a dynamic grid (for surface growth first), and working on the heat equation cases.