Skip to content

January 2020 Morning Status Meetings

sblondel edited this page Jan 21, 2020 · 15 revisions

This page contains a brief summary of the status of the Xolotl development team each morning during the month of January 2020.

20200103

Sophie - Continuing scaling study of 2D/3D NE. Checking the reactions in plsm.

20200106

Sophie - Analyzing the dynamic grid data. Working on creating a grouped network in plsm.

20200107

Sophie - Continuing to work on grouped network in plsm. Investigating the PETSc error in the coupled code.

20200108

Sophie - Continuing to work on grouped network in plsm and investigating the PETSc error in the coupled code.

20200110

Sophie - Connecting the plsm network to the rest of the code, continuing to investigate the PETSc error in the coupled code.

20200113

Sophie - Fixing the partial derivatives in plsm branch. Starting on the NE network implementation.

20200114

Sophie - Running 0D NE simulations with and without re-solution. Continuing on the NE network plsm implementation.

20200115

Sophie - Working on the issue with rates in plsm NE network and face to face presentation.

20200117

Sophie - Working on the face to face presentation.

20200121

Sophie - Working on the face to face presentation and continuing on the rate in NE plsm.

Clone this wiki locally